These walls enclose the walk-in refrigerator as well as a utility closet where the water heater's gonna be. I painted the cedar plywood with teak oil and stained these trim pieces, and Silas installed them.
Saturday, March 21, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment