Monday, April 6, 2009

Beginning Work on the Arbors

Above: Digging post holes for the main arbor in front of the french doors on the patio. Below: post holes for the arbor going in front of the main entrance to the building.

Above and below: the logs installed on the concrete foundations; the logs have been painted with a redwood-tinted wood stain.

No comments: