Wednesday, May 13, 2009

First coat of lime plaster on the outside of the Common Building, part I



a
e

Some up-close shots. The first pic shows the wall below the redwood deck, which has two coats of earthen plaster beneath it; the second pic shows some detail on that wall. The third shot is of the plastering process. The fourth shows the plaster going on top of the tar paper/wire mesh stapled to the mill room/oven room/utility room. The last pic shows the plastering crew stapling the tar paper and chicken wire mesh onto the plywood walls