Sunday, January 25, 2009

Installing the Walk-in

Sid Layton came to install this 6 X 8' walk-in refrigerator, which will store bread that Jo and Rosie bake for their "Rise Up Artisan Bread" business this year. This was at the beginning of January, and most of the process is chronicled here, in several entries; scroll down the page for awhile to see the thing slowly go up....
John and Autumn tacking down the wood which holds the panels in place until they all got installed.
Another view of the panels before being unloaded; I just like this shot because it looks like the orange strawbale cottage is tipping to the right, which is weird but cool.
The panels laid out before being installed...I think there were about 10 of them all told.
The first panel...

No comments: